Infi-NET LLC
ServicesProjectsService AreasAboutContactRequest a Project Review

INFI-NET LLC / FIBER & LOW-VOLTAGE INFRASTRUCTURE / FORT MYERS, FL

Field-Tested Deployment Teams for Complex Infrastructure Projects

Fiber deployment, structured cabling, and low-voltage infrastructure for multifamily and commercial properties — executed by consistent crews, documented to standard, across 10+ states.

ITU-T G.657-A2 / G.652DTIA-568-C.2NFPA 70, ARTICLE 800LOSS BUDGET: ≤0.1 dB/SPLICE
100+Documented deployments
10+States with active capability
1,000+Units connected
35+Years combined field experience
FOR PROPERTY OPERATORS

Your residents keep living here while we build.

Occupied-building deployments run on scheduled unit access, communicated work windows, and crews accountable to your resident-experience standards — because connectivity is a retention factor, not just a utility.

FOR ISP & TELECOM PARTNERS

One crew owns the build, end to end.

OSP, splicing, and inside plant executed by the same team — OTDR-verified to a ≤0.1 dB budget and handed off with the documentation package your engineers expect.

EXECUTION SEQUENCE

Five Phases. Every Deployment.

The sequence is the standard: no phase starts before the last one is verified, and each hands documented outputs to the next.

PHASE 01

Plan

Scope assessment, documentation review, and stakeholder alignment before a single trench is cut.

Defined scope · milestone schedule · named crew
PHASE 02

Survey

On-site infrastructure survey, conduit path mapping, and IDF location confirmation.

Site survey · pathway map · IDF locations
PHASE 03

Deploy

Fiber installation, conduit runs, IDF buildout, and in-unit termination by consistent field crews.

OSP · riser · IDF · in-unit termination
PHASE 04

Test

OTDR testing, certification, and end-to-end verification at every node.

OTDR traces · certified test results
PHASE 05

Deliver

Final commissioning, as-built documentation handover, and ISP handoff coordination.

As-builts · test package · ISP handoff
DEPLOYMENT FOOTPRINT

Ten States. One Standard.

Field crews mobilize from Fort Myers across state lines with the same management, the same documentation, and the same loss budget. Hover a state for its record.

DEPLOYMENT FOOTPRINT — CONTIGUOUS U.S.HUB: FORT MYERS, FL
ACTIVE DEPLOYMENT STATEMOBILIZATION FROM HQ
FIELD RECORD

How Deployments Actually Went

The questions operators and ISP partners ask when evaluating a contractor — answered from documented projects, not marketing copy.

Technician fusion-splicing fiber in an IDF at the Jacksonville deploymentMDU FIBER / 8 BUILDINGS
PROJ-FL-2025-001Multifamily property operator

Jacksonville MDU — Fiber Backbone

Full fiber backbone deployment across an eight-building multifamily property: OSP construction, underground distribution, vault splicing, IDF buildout, and in-unit termination.

RESIDENT / OCCUPANT DISRUPTION
Work was sequenced building by building and coordinated through on-site property management, so in-unit access was scheduled and predictable rather than open-ended. The same crew worked the property from first trench to final test.
TIMELINE
Executed against a documented scope with phased delivery milestones and delivered on the committed schedule.
DOCUMENTATION DELIVERED
OTDR traces for every splice, certified test results, as-built documentation, and an ISP handoff package delivered at closeout.
Underground vault fiber workMDU FIBER / 300+ UNITS
PROJ-CO-2024-001Regional property management group

Westminster MDU — Fiber Deployment

Complete fiber infrastructure for a 300+ unit multifamily community — a greenfield build covering full OSP construction through in-unit termination.

RESIDENT / OCCUPANT DISRUPTION
Greenfield sequencing was coordinated with the property's construction schedule so fiber pathways, IDF rooms, and in-unit terminations landed ahead of occupancy instead of behind it.
TIMELINE
Full-lifecycle scope executed by one contractor — no handoffs between OSP, splicing, and inside-plant subcontractors to reconcile.
DOCUMENTATION DELIVERED
As-built documentation, OTDR test package, and ISP coordination delivered as standard closeout items.
IDF rack and patch panel buildoutMDU FIBER / 350+ UNITS / OCCUPIED
PROJ-GA-2024-001Multifamily property operator

Atlanta MDU — High-Density Fiber

High-density fiber deployment for a 350+ unit luxury multifamily property, executed while the building remained fully occupied and operating.

RESIDENT / OCCUPANT DISRUPTION
Every phase was coordinated with active property management: scheduled unit access, communicated work windows, and crews accountable to the property's resident-experience standards — the occupied-building discipline Infi-NET treats as a core competency.
TIMELINE
Phased execution kept common areas and amenities available throughout the deployment.
DOCUMENTATION DELIVERED
Certified test results and as-built documentation delivered at handover, giving the operator a complete record of the installed plant.
WHY INFI-NET

What You're Actually Hiring

Multi-state deployment capability

Field crews mobilize across state lines with consistent project oversight. Same standard whether the property is in Jacksonville, Westminster, or Atlanta.

Consistent field crews

The same crew from first trench to final test. No rotating subcontractors, no quality variance between phases.

Structured project execution

Every deployment follows a documented scope with phased delivery milestones. No surprises, no scope creep without sign-off.

Documentation standards

OTDR traces, certified test results, as-built documentation, and ISP handoff packages are standard deliverables — not add-ons.

Occupied-building experience

Brownfield deployments in occupied multifamily properties demand a different level of coordination. It is a core competency here, not an exception.

Reliable execution

National multifamily operators and telecommunications partners have trusted Infi-NET with their infrastructure. Projects completed on schedule.

PROJECT INQUIRY

Tell us about the property. We'll tell you how we'd build it.

Send the location, scope, and timeline — an assessment comes back within 24 hours. No obligation.